Traffic Alerts

◄ Back
January 9, 2026 12:00 PM

Road Watch

Please be advised of the following road construction projects beginning in January.

Arizona Department of Transportation (ADOT)

Pinal Avenue & Centennial Boulevard Traffic Signal Installation

The Arizona Department of Transportation (ADOT), in partnership with the City of Casa Grande, will begin installation of a new traffic signal at Pinal Avenue and Centennial Boulevard.

Start Date: Monday, January 12
Completion: Fall of 2026

For questions about the project, please contact the City of Casa Grande’s Project Manager, Owen Mills, at (520) 421-8625 or visit the project webpage at www.azdot/centennial-pinal-387

Pinal Avenue & Viola Street HAWK Signal Installation

The Arizona Department of Transportation (ADOT) will begin a project to install a High Intensity Activated Crosswalk (HAWK) signal at Pinal Avenue and Viola Street to improve safety by providing a designated, protected crossing across State Route 387 (Pinal Avenue).

Start Date: January 2026
Completion: Fall 2026

For questions about the project, please contact the ADOT Project Information Line at (855) 712-8530 or visit the project webpage at www.azdot.gov/SR387-hawk-project

METRONET

Please be advised that Metronet will be in multiple locations throughout the City of Casa Grande, January through March of 2026.

When: January 26 through March 2
Time: 9 am to 4 pm
Locations:

• E. Florence Blvd from S. Hacienda Rd – S. Mission Pkwy

When: January 19 through February 13
Time: 7 am to 4 pm.
Locations:

• Shoulder work along N. Peart Rd from E. Cottonwood Ln to E. Kortsen Rd

When: January 26 through March 2
Time: 9 am to 4 pm.
Locations:

• Lane shifts and lane closures along Mission Pkwy and Promenade Pkwy

When: January 26 through March 6, 2026
Time: 7 am to 4 pm.
Locations:

• Lane shifts along N. Colorado St from N. Cottonwood Ln to Sunset Dr
• Shoulder work along N. Peart Rd from E. Cottonwood Ln to E. Douglas St

When: January 30 through March 30
Time: 9 am to 4 pm.
Locations:

• Right lane closure along eastbound lane of Cottonwood @ Thornton Rd
• Right lane closure along eastbound lane of Cottonwood Ln between Thornton Rd and N. Casa Grande Ave.
• Right lane closed along eastbound lane of E. Cottonwood Ln from N. Gilbert Ave to N. Peart Rd
• Southbound right lane closures at the intersection of N. Trekell Rd @ E. Cottonwood Ln
• North and southbound center lane closures at the intersection of N. Trekell Rd @ E. Cottonwood Ln
• Lane shifts at the intersection of N. Colorado St and E. Cottonwood Ln

When: February 2 through March 2
Time: 7 am to 6 pm
Locations:

• Shoulder work along N. Peart Rd from E. Kortsen Rd to E. Rodeo Rd

To keep the community informed, Metronet has a dedicated construction website at www.Metronet.com/cct. The site includes detailed information about the construction process, helpful videos, and a way for residents to alert Metronet of any potential concerns—such as underground sprinkler systems or invisible pet fences.

Residents with questions about installation need to contact Metronet directly and visit www.Metronet.com/cct for assistance.
All Metronet team members and vehicles will be clearly marked with the company’s logo for easy identification.

Facebook Twitter Email