Landscape Plan
Last Content Update:
How to Apply for a Landscape Plan or Landscape Plan Amendment
An overview of the Landscape Plan process in the City of Casa Grande.
At a Glance
- A Landscape Plan provides construction-ready landscape and irrigation details.
- Approval is required prior to building permit issuance or final plat recordation, as applicable.
- Landscape Plan Amendments are required when approved landscaping is proposed to be changed.
- Plans are reviewed administratively by Planning & Development staff.
- An irrigation plan is required with all Landscape Plan submittals.
What Is a Landscape Plan?
A Landscape Plan includes the calculations, data, and detailed drawings for all landscaped areas, screening walls, and irrigation systems associated with a development. The plan must be consistent and comply with City landscaping standards.
When Is a Landscape Plan Required?
City Code requires that a Landscape Plan be submitted with other required site improvement and building plans at the time of building permit application, or prior to recordation of a final plat. The plan must be approved by the Planning & Development Director before permits are issued or plats are recorded.
What is a Landscape Plan Amendment?
A Landscape Plan Amendment is required when changes are proposed to an approved Landscape Plan. Amendments ensure that modifications continue to meet City landscaping requirements and approved development conditions.
When is a Landscape Plan Amendment Required?
- A Landscape Plan Amendment is required when proposed changes include, but are not limited to:
- Changes to plant species, quantities, or sizes. •Reductions or reconfiguration of landscaped areas or buffers.
- Modifications to irrigation layout, water source, or coverage areas.
- Changes to walls, screening, or landscape features shown on the approved plan.
- Adjustments required due to field conditions that alter the approved landscape design.
Landscape Plan Amendment Submittal Requirements
Applications for a Landscape Plan Amendment must include the following:
- Completed Landscape Plan application, identifying the request as an amendment.
- A copy of the originally approved Landscape Plan.
- Revised landscape and irrigation plan sheets clearly identifying all proposed changes.
- A written narrative describing the reason for the amendment and summarizing changes.
- Updated landscape calculations, if applicable.
- Owner/Applicant Indemnification Statement, if landscaping is located in the public right-of-way.
Step-by-Step Landscape Plan Submittal Process
- Prepare the Landscape Plan and required irrigation plan in accordance with City standards.
- Complete the Landscape Plan application and checklist, indicating whether the request is a new plan or an amendment.
- Email the application and checklist to the Planning & Development.
- After staff review, pay the required review fees as instructed by the City.
- Upload all plan sheets and supporting materials to the City-provided upload link.
- City staff reviews the submittal and issues comments or approval.
- If revisions are required, resubmit updated plans for final approval.
Landscape Plan Submittal Checklist
- Completed Landscape Plan application.
- Submittal requirements checklist sheet.
- Landscape Plan sheets showing date, scale, north arrow, dimensions, and vicinity map.
- Property lines, easements, right-of-way, and adjacent improvements.
- Landscape statistics table with required and provided landscape calculations.
- Planting plan identifying plant sizes, quantities, and locations.
- Details for walls, monuments, and other landscape features.
- Irrigation plan showing water source, controllers, backflow prevention, and irrigation coverage.
- Signed Owner/Applicant Indemnification Statement if landscaping is proposed within the public right-of-way.
Fees
- Planning review fee: $157.50 per plan sheet
- Technology Recovery Fee: 5% of the applicable review fee
Typical Review Timeframes (Maximum Business Days)
- Completeness review (initial): 5 business days
- Initial substantive review: 30 business days
- Completeness review (resubmittal): 5 business days
- Resubmittal substantive review: 30 business days
- Overall review timeframe: 70 business days
-